Central Financial Assistance up to ₹78,000 for residential rooftop systems is currently live. We handle registration, documentation and net-metering end to end.
An illustrative 500 kWp industrial rooftop sized against a processing plant’s sanctioned load, showing how a completed-project page will read once real project data replaces this placeholder.
Illustrative only: a 500 kWp system at Surat’s ~4.3 units/kWp/day average generates roughly 2,150 units/day (≈7,84,000 units/year) offsetting sanctioned industrial load. Replace with the actual meter readings once this is a real project.